lynx Case Study: 10m Tilting Mast on Marine Survey ship
This challenging project stands as a testament to the quality of our design and installation teams– whatever the task, lynx metmAsts will perform.
lynx Case Study: Climbing Derrick System
The client contacted lynx metmAsts for a second opinion and we were able to meet their requirements in full. Remedial works involved erecting our climbing derrick system alongside the met mast. The derrick provided support at critical points and enabled full height access for the replacement of all guy wires. The mast was then re-aligned and certified to the OEM specifications. The client is delighted that they maintain consistent wind measurement assessment for another 12 months, following which the mast can be safely de-commissioned. This project stands as an example of our innovation and the considerable work at height experience of the lynx metmAsts team.
Monday, 10 September 2012
Evolution of Wind Turbines
An infographic on the evolution of wind turbines - from a musical windmill to the massive energy generating structures as we know them today.
Infographic courtesy : http://turbinegenerator.org